Connecting an EcoFlow power station to an apartment or private house with an ATS
Your EcoFlow power station sits in the corner, and during an outage extension leads run from it to the fridge, router and desk lamp? You can live like that, but it is inconvenient. And you cannot connect the boiler, room lighting or a pump through an extension lead at all. It is much more convenient to wire the station into the distribution board properly once: set up a backup group and install an ATS or a “grid – 0 – backup” changeover switch. Then, when the power goes out, the sockets and lamps you chose in advance simply keep working.
Who needs it
- You already have an EcoFlow station (or another portable power station) and want it to power the regular wiring of your apartment or house rather than extension leads.
- You need the gas boiler, circulation pump, lighting, fridge, router and cameras to keep working during outages.
- You are planning renovation or a new distribution board and want to provide a backup line straight away.
- You are wondering whether to switch to a stationary battery + inverter kit later. Properly split wiring will suit it too: the backup group is simply reconnected to the new source.
How it works
The main idea: all the wiring is split into two parts. The main group is the powerful loads the station cannot handle: the water heater, electric cooker, washing machine, air conditioner. The backup group is what must always work: lighting, the boiler, the fridge, the router and a few sockets.
The backup group is not connected directly to the incoming supply but through a source selector. This can be a manual switch with I – 0 – II positions or an automatic ATS built on contactors. While the grid is on, the backup group is fed from it, and in the meantime the station charges through a separate socket. When the grid goes down, the backup group switches to the station’s output.

Important: the station is charged from the grid before the switch, i.e. on the incoming supply side. If you connect its charger to the backup group, during an outage it will try to power itself.
Many EcoFlow stations have an EPS mode: while there is grid power at the AC input, the station passes it through to its sockets, and when the grid disappears it switches to the battery. For the DELTA 2, catalogues give a switchover time of up to 30 ms. So in practice the switch is often kept in the “station” position all the time, and the “grid” position is used as a bypass: when the station needs to be switched off, serviced or taken with you. Remember that in this mode the entire backup group load passes through the station, so even with the grid on it must not exceed the station’s output power.
Diagram 1. Manual “grid – 0 – station” switch
The simplest and most reliable option for an apartment. A two-pole I – 0 – II switch is fitted in the board. The grid goes to input I, the station output goes to input II through a power inlet on the board, and the backup group is fed from the output. The switch design mechanically prevents connecting the grid and the station at the same time, and position 0 disconnects the group completely.

How the station connects to the board. A fixed power inlet is installed on or next to the board, and a cable runs to it from the station: an ordinary plug into the station’s socket at one end and a connector that fits onto the power inlet at the other. There are no exposed live pins anywhere.
What you must never do. Use a “male-to-male” cable with two plugs, one plugged into an apartment socket and the other into the station. The free plug of such a cable carries 230 V and is easy to touch. The station’s voltage goes into all the wiring and therefore onto the line where people may be working. When the grid comes back, it meets the station’s voltage: at best this destroys the station’s inverter, at worst it causes a fire.
Diagram 2. Automatic ATS on contactors
If the station does not always run in EPS mode, or you want switching to happen without your involvement, an automatic system is built on two contactors. Contactor KM1 connects the backup group to the grid, KM2 to the station.

- The KM1 coil is fed from the grid through a voltage relay. Voltage is normal: KM1 is closed, and the group runs from the grid.
- The grid has gone or is outside the thresholds: KM1 releases. The KM2 coil is fed from the station output through the normally closed contact of KM1, and the group switches to the station.
- The grid is back: after a delay, the voltage relay switches on KM1, and its normally closed contact breaks the KM2 circuit.
Mutual interlocking is mandatory. Electrical (via auxiliary contacts) and mechanical (a separate unit between the contactors). The contactors must break both the phase and the neutral so that the grid neutral is never connected to the station neutral. The contactor rating is chosen by the backup group current with a margin.
Station power, neutral and earthing
Power. The backup group must not exceed the station’s rated output power. According to catalogues, this is 1800 W for the DELTA 2 (2700 W peak) and 3600 W for the DELTA Pro (7200 W peak). Peak power is only for a brief start-up surge; you cannot run on it continuously. Before designing, check the datasheet of your exact model. X-Boost mode, available on many EcoFlow stations, lets you start some higher-power appliances by lowering the voltage, but do not count on it for a boiler, a pump or electronic equipment.
Adding it up. A boiler with a pump, a fridge, LED lighting, a router and cameras together usually come to a few hundred watts. But a kettle, microwave or iron in the backup group will quickly overload the station. That is why the kitchen sockets for such appliances are better left in the main group.
Neutral and earthing. The switch or contactors must be two- or four-pole so that they switch both L and N. The protective conductor PE is not switched: it is common to all the wiring and runs through the plugs and sockets to the station’s housing. How the neutral is bonded to earth inside the station when running on battery depends on the model, so the RCDs and RCBOs in the backup group must be checked with the “TEST” button specifically while running on the station.
Which devices are suitable
| Device | What it can do | When to choose |
|---|---|---|
| Hager SFT240 | Manual I-0-II switch, 2 poles, 40 A / 230 V | Diagram 1 for an apartment: single-phase supply, backup group up to 40 A |
| Hager HIM306 / HIM406 | Modular three-position I-0-II switch, 63 A, 3 or 4 poles, wires up to 35 mm² | A house, a three-phase board or extra current headroom |
| Hager HIC406A | Modular motorised ATS switch I-0-II, 4 poles, 63 A | Ready-made automation instead of a contactor assembly |
| Schneider TeSys D contactors + LAD9V2 unit | The LAD9V2 is a mechanical interlock for LC1D09–D38 contactors in reversing and source-changeover circuits | Diagram 2: your own ATS assembly in the board |
| EcoFlow Smart Home Panel (EU version) | Branded panel for the DELTA Pro, in European catalogues: 220/240 V, up to 10 circuits | Only as an option: check availability in Ukraine and compatibility with your station with the supplier |
The data is taken from manufacturers’ and distributors’ catalogues. The American versions of the Smart Home Panel are designed for 120/240 V 60 Hz grids and are not suitable for Ukraine. Before buying, check the datasheet of the specific device.
How to do it: step by step
- Make a list of backup loads. Write down what must work during an outage and add up the power. Compare it with the station’s rated output power, leaving a 20–30% margin.
- Estimate the run time. Divide the station’s battery capacity in Wh by the group’s average consumption. This tells you how many hours the charge will last and whether you should add an extra battery.
- Split the wiring. In the board, separate the breakers of the backup lines from the main ones. If lighting and sockets in the apartment share the same lines, you may need to run a separate cable.
- Choose the scheme. The station is always in EPS mode: a manual switch is enough (diagram 1). You need fully automatic switching without EPS: an ATS on contactors or a ready-made modular ATS (diagram 2).
- Install a separate socket for charging. A socket with its own breaker on the grid side, before the switch. The station’s AC input is fed from it.
- Install the power inlet and cable. A fixed power inlet on the board and a “plug – connector” cable of the right cross-section. No home-made cables with two plugs.
- Test it. Switch off the main breaker and make sure the backup group has switched to the station and the main group is de-energised. Switch the grid back on and check the return. Press “TEST” on the RCD in both modes.
Safety first
Never feed voltage from the station into the wiring through a socket with a “male-to-male” cable: it is deadly dangerous for you and for electricians working on the line. The backup group must only be connected through a switch or ATS with interlocking that rules out connecting the station and the grid at the same time. Do work in the board with the incoming supply switched off and after checking that there is no voltage. If you have no experience, have the installation done by a qualified electrician.
Expert opinion
An EcoFlow station wired into the board through a switch is a big step forward compared with extension leads: the room lighting, boiler and fridge work on their own, and you do not even notice the outage. But let us be honest about the limits: a portable station has limited power and capacity, and its inverter works at the edge of its capabilities when the entire backup group runs through it all the time. If outages are long and there are many loads, it makes more sense to look at a stationary battery + inverter kit: more power, a battery of the right capacity, the option to connect solar panels. The good news is that wiring split into groups and a switch in the board will be needed for it too.
Want to connect your station properly or compare it with a kit? We do turnkey installation in Dnipro. Call us: 093 293 93 93, 099 054 40 38. MinerTech engineers will advise on your specific task.