Description
MinerTech SP-15 — An “all-in-one” solution: a metal frame, a shelf and a chipboard panel for the breakers, and a closed lower compartment for the battery. For those who want a ready, tidy “energy module” with room for circuit breakers and no separate panel on the wall.
Why a stand rather than the wall
- Rented apartment — not a single hole in the wall: the landlord has nothing to complain about, and when you move you take the whole station with you, stand included.
- Fresh, high-quality renovation — tiles, decorative plaster, wallpaper and painted walls stay intact; no need to look for hidden wiring before drilling.
- Weak walls — plasterboard, aerated concrete and thin partitions do not hold 6–15 kg of inverter with a vibrating fan well; here the weight is carried by the steel frame and the floor.
- Fire safety — a non-combustible metal frame instead of a wooden cabinet or shelf; the battery sits at the bottom, so the centre of gravity is low.
- Cooling and service — open design: air flows from all sides, and the terminals, breakers and display are accessible without dismantling.
- Tidiness — the cables are fixed with ties to the frame tubes, and the station looks like a single technical module rather than a pile of boxes on the floor.
Technical specifications
| Dimensions (H × W × D) | 1510 × 540 × 500 mm |
| Lower battery compartment | height 685 mm, chipboard shelf |
| Shelf + panel for circuit breakers | Chipboard, above the battery compartment |
| Inverter area | rear frame up to 1510 mm |
| Material | steel box section + laminated chipboard |
| Coating | frame — powder coating (standard black RAL 9005), chipboard colour of your choice |
| Frame warranty | 2 years |
What fits
- inverters up to 11 kW
- Batteries for the compartment ≈ 480 × 440 mm: 2 × 12.8V 100Ah side by side (24V kits), Cyccle Volt / ECONOMI POWER 25.6V 100Ah, PWOD 12.8V 320Ah, Humsienk Plus 160Ah
- DIN circuit breakers, RCD, voltage relay, “grid/inverter” switch on the panel
Not suitable: cases 500–540 mm long (EASUN POWER, GSIKE, EKPAOWE, Nexcell 25.6V, 12.8V 300Ah) and DATOU BOSS 8.03kWh (565 mm high) — for these, use ST-2B; 51.2V rack batteries — RK-3/RK-5/RK-8.
Installation tips
- Place the rack on a level, solid floor. On tiles or laminate, put rubber or felt pads under the feet.
- The heaviest part, i.e. the battery, always goes at the bottom. The inverter is attached to the crossbars through its standard mounting plate with M6 bolts or self-tapping metal screws.
- Leave ≈ 200 mm of free space above and below the inverter and ≈ 100 mm on each side: most hybrid inverter manuals require this for cooling.
- Keep the battery–inverter power cables as short as possible (up to 1.5–2 m) and install a DC circuit breaker or fuse next to the battery.
- Connect the frame to ground (PE conductor of at least 6 mm²): then the rack is grounded in the same way as the inverter case.
- Do not place the station near radiators, in direct sunlight or in a closed cabinet without ventilation.
Manufacturing and colour
The frame is welded from steel box section; the seams are cleaned and the structure is powder-coated and oven-baked. The coating is dense and resistant to moisture, scratches and UV. Standard colours are black RAL 9005 and white RAL 9016; any other RAL colour and non-standard sizes for your equipment are available to order. Frame warranty — 2 years.
Drawings with all dimensions and the technical description are in the PDF on this page.
Expert opinion
If you want the station to look like furniture: frame and chipboard in one colour, circuit breakers on their own panel, battery covered by a shelf on top. Suitable for 12.8V and compact 25.6V batteries; for the DATOU BOSS 8.03kWh (565 mm high), the ST-15 or ST-2B is better.
We will select a stand for your equipment. Advice from a technical specialist: +38 099 054-40-38.









