The optimal distribution board for a private house: what to install, how to group the circuits and where to leave room for backup
The distribution board in a private house is not just a box of breakers. It decides whether your appliances survive a phase imbalance, whether a wet washing machine gives you a shock, and whether you can connect a battery + inverter kit without rework when outages start again. The good news: an optimal board is assembled from well-known modules following a clear logic. Here is what it should contain, in what order and why.
Who needs it
- You are building a house or doing a major renovation and want to assemble the board once and for a long time.
- Your old board has a few fuses or unlabelled breakers, and all the sockets sit on a single line.
- You are planning backup power, a battery + inverter kit or a generator, and want the most important loads to work during outages.
- You have a three-phase supply and need to distribute the load across the phases sensibly.
What an optimal board consists of
Let us follow the current, from the incoming supply to the sockets:
- Main breaker. The main switch of the house. Its rating is set by the connection specifications from the regional power company, i.e. the permitted capacity. You must not fit a “bigger one just in case”: it has to protect the incoming cable.
- Meter. It is usually installed and sealed by the distribution system operator. It is often a separate box on the façade or a pole.
- Type 1+2 SPD (surge protection device). For a house with an overhead supply and its own earth electrode, this is the optimal choice: it suppresses lightning surges on the line and switching spikes. The SPD is installed as close to the incoming supply as possible, and its PE conductor is connected to the main earthing bar.
- Voltage relay. It disconnects the whole house if the voltage goes beyond safe limits, for example when the neutral breaks and up to 380 V can appear in the sockets. When the voltage returns to normal, the relay restores power by itself after a delay. The relay rating must be no lower than that of the main breaker.
- Circuit groups with 30 mA RCDs or RCBOs. Each group has its own breaker, chosen for the cable cross-section. Sockets, the bathroom, the kitchen and outdoor circuits must go through 30 mA residual current protection.
- Backup section. A separate busbar for loads that must work during outages. Today it is worth providing it straight away, even if you buy the inverter later.

The diagram shows the main idea: after the incoming supply and general protection, power reaches the busbar, from which the groups branch off. The backup section is highlighted on the right: it is fed through a battery + inverter kit (or a generator via an ATS) and powers the lighting, boiler, fridge, router and CCTV. The rest of the house is de-energised during an outage, so the battery is not spent on the water heater or the cooker.
Earthing: the TN-C-S system
Most private houses in Ukraine are fed from a TN-C network, where the neutral and protective conductor are combined in a single PEN wire. To have proper N and PE in the house, the PEN is split in the incoming board: the conductor goes to the PE bar, and from it via a jumper to the N bar. The repeat earthing, i.e. the earth electrode by the house, is connected at the same point.

The main rule: the PEN is split only once. Beyond that, N and PE are never connected anywhere in the house, otherwise the RCDs will not work correctly. The earthing system type and the split point are agreed with the regional power company. Without earthing, the SPD has nowhere to divert a surge, and the metal housings of the water heater, washing machine or pump are left unprotected.
How to group the circuits
The rule is simple: a separate line for each room or socket area, separate lighting, and a separate line for each powerful appliance. Then a short circuit in one socket will not leave the whole house without light, and an electrician can easily find the fault. Indicative ratings for copper cable:
| Group | Breaker | Cable (copper) | Residual current protection |
|---|---|---|---|
| Lighting | C10 | 3×1.5 mm² | As designed; outdoor lighting via a 30 mA RCD |
| Room sockets | C16 | 3×2.5 mm² | RCBO or 30 mA RCD |
| Kitchen sockets (kettle, microwave) | C16, preferably 2 lines | 3×2.5 mm² | 30 mA |
| Bathroom, washing machine | C16 | 3×2.5 mm² | 30 mA mandatory |
| Electric cooker, oven | C32 | 3×6 mm² | RCD 40 A / 30 mA |
| Water heater | C16 (up to ≈3 kW) | 3×2.5 mm² | 30 mA |
| Air conditioner | C16 | 3×2.5 mm² | As per the appliance datasheet |
| Outdoors, garage, pump | C16 | 3×2.5 mm² | 30 mA mandatory |
| Feed to the backup section | By inverter current, e.g. C25 | By breaker rating | As per the inverter manufacturer’s diagram |
These are typical values with a margin for concealed wiring that electricians use. The final breaker rating is chosen by the cable cross-section, length and installation method according to the PUE and DBN V.2.5-23 (Ukrainian electrical rules), and the appliance power is taken from its datasheet. A powerful 4–6 kW cooker or water heater is calculated separately.
Backup group for an inverter or generator
The most common mistake we see on call-outs: the inverter has been bought, but there is nowhere to connect it because all the loads are mixed across the groups. That is why an optimal board has a dedicated backup section from the start:
- A separate breaker runs from the main busbar to the inverter input (AC IN).
- The inverter output (AC OUT) feeds a separate busbar with its own breakers: lighting, the boiler and circulation pump, the fridge, the router, CCTV.
- A 1-0-2 switch lets you feed the backup section directly from the grid if the inverter is being serviced. The zero position guarantees that the inverter output is never connected to the grid.
- A generator needs a manual changeover switch or an ATS so that it never “backfeeds” into the power company’s grid.
This way the battery + inverter kit powers only what is really needed, and the capacity lasts longer.
Module layout and spare space
For a typical house, a 3–4 row board is convenient. The layout logic: the first row is the incoming supply and protection, then lighting and sockets, then powerful loads, and a separate row for the backup section.

Leave 20–30% of the slots free. Within a few years an air conditioner, a heat pump, an EV charger or solar panels will appear, and you will not have to replace the board. Label every module: the group number and what it powers. Put the board’s single-line diagram in the door.
If the supply is three-phase
The principle is the same, but there are nuances:
- The main breaker, SPD and voltage relay are three-phase (3P or 4P, depending on the scheme).
- Single-phase groups are distributed across phases L1, L2 and L3 so that the load is roughly even. Powerful appliances are spread across different phases.
- Three-phase loads (pump, boiler, heat pump, machine tool) are connected with separate 3P breakers.
- For critical single-phase loads, an automatic phase switch is useful: if one phase disappears, it moves the load to another.
- The battery + inverter kit can be single-phase for the backup section, or three-phase if three-phase loads must be on backup.
How to do it yourself: step by step
- Find out the permitted capacity. Look at the connection specifications or your contract with the regional power company: the main breaker and the incoming cable cross-section depend on it.
- Make a list of groups. Walk around the house and write down all the rooms, socket areas and powerful appliances. Mark separately what must run on backup.
- Choose breakers and cables. Use the table above and check it against the appliances’ power ratings.
- Count the modules. Add up all the modules, add the backup section and a 20–30% reserve. Choose an enclosure with the right number of rows, metal or plastic, with N and PE bars.
- Install the earthing. An earth electrode by the house, and the PEN split in the incoming board as agreed with the regional power company.
- Assemble the board. Comb busbars instead of wire jumpers, and each group with its own neutral after its own RCD.
- Label and test. Markings on every module, a “Test” button check of every RCD, and an earth resistance measurement.
Safety first
The board is assembled and connected only with the incoming supply de-energised and after checking that there is no voltage. Splitting the PEN, connecting to the power company’s grid and installing the earthing must comply with the PUE and DBN V.2.5-23, so leave this work to a qualified electrician. Breaker ratings and cable cross-sections must match the load, and an inverter or generator is never connected to the grid directly, without a changeover switch with a zero position or an ATS.
Expert opinion
The optimal board is not necessarily the most expensive one. The right logic matters more: protection at the incoming supply (SPD and voltage relay), 30 mA RCDs where there is water and people, separate labelled groups and free space for the future. And in today’s Ukrainian reality, we strongly recommend providing a backup section: even if the battery + inverter kit comes later, connecting it will take an hour rather than rebuilding the whole board.
Want to build a board with a backup group or connect an inverter to an existing one? We do turnkey installation in Dnipro. Call us: 093 293 93 93, 099 054 40 38. MinerTech engineers will suggest the optimal scheme for your house.