dp-5215d66481897fc8384390ed220e52e4
Inverter EASUN SMT-4KW 24Vdp-7eb228768661db5e78578e96bb8127d6dp-e4e49222047a6f816199dacc986fa70edp-f47b5cfcf1e12b251cb5b6b8142320c4

Kit EASUN SMT-4KW 24 V + GSIKE 25.6 V 100 Ah 2560 Wh

35 800 UAH ≈ 788 $

Out of stock

Prices are in Ukrainian hryvnia (UAH). We ship to all countries. To order from abroad, contact us at +380 99 054 40 38 (Viber, Telegram, WhatsApp) and we will calculate delivery to your country.
SKU: dp-p-kit-easun4kw-gsike25v Category:

Description

A ready-made 4 kW backup power kit: the hybrid inverter EASUN SMT-4KW 24 V and the lithium battery GSIKE 25.6 V 100 Ah 2560 Wh. The battery works without a communication cable: in the inverter you select the user-defined battery type (USE) and set the charge and cut-off voltages — all menu items and values are in the PDF “Kit connection and setup”. When the power goes out, the house switches to the battery within 10 ms, and when there is grid or solar power, the battery charges.

Who this kit is for

  • For an apartment or house that needs to ride out outages of several hours.
  • For a boiler, pumps, fridge, lighting, router, laptops and TV all at once.
  • For those planning a solar station: panels can be connected to the inverter right away or later.

How long it runs without grid power

Usable energy reserve — about 2.07 kWh.⁠‍‍​​​​​​​​​​​‌‌​‌‌​​‌‌‌‌‌​⁠ Approximately:

300 W (fridge, router, lights) ≈ 6.9 h
500 W (+ TV, laptops, boiler) ≈ 4.1 h
1,000 W ≈ 2.1 h
2,000 W ≈ 1 h

Kit advantages

  • Selected by engineers — the inverter and battery have been tested together; all settings are in the PDF “Kit connection and setup”.
  • 4 kW of power — pure sine wave 230 V for a boiler, pumps and sensitive equipment.
  • The honest truth about the battery — the continuous output from the battery is limited by its BMS (the exact current is shown on the label on the case), so it is better not to switch on very powerful appliances at the same time. The inverter delivers its full power when there is grid or solar power.
  • Safe LiFePO4 chemistry — a maintenance-free battery for everyday use.
  • Solar-ready — built-in MPPT controller 60–500 V.
  • WiFi monitoring — the system status is visible in the phone app.
  • Turnkey installation in Dnipro and the region: we will install, configure and show you how to use it.

Main specifications

Inverter power 4,000 W
Battery energy 2,560 Wh (25.6 V, 100 Ah)
Solar panel input 60–500 V, Voc up to 500 V, up to 15 A
Transfer time 10 ms
Inverter ↔ battery communication no communication cable; battery type in the inverter — USE
Monitoring WiFi (inverter)
Max. charging current from the 220 V grid 100 A
Max. solar charging current 120 A
Max. total charging current (solar + grid) 120 A
Grid voltage range 90–280 V (“appliances” mode), 170–280 V (UPS mode)
Max. bypass current (from the grid) not specified separately: via bypass — up to the rated 4000 W; on overload the protection trips and the output switches off
MPPT operating range 60–500 V
Battery operating voltage range 20–29.2 V (standard for LiFePO4 8S)
Inverter dimensions 423 × 290 × 100 mm (height × width × depth)
Inverter weight 7 kg
Battery dimensions 502 × 187 × 242 mm
Battery weight 18.9 kg
Total kit weight 25.9 kg

The kit includes

  • Inverter EASUN SMT-4KW 24V
  • Battery GSIKE 25.6V 100Ah 2560Wh

Recommended: power cable sets for the inverter

All of the system’s current flows through the cables between the battery and the inverter — under load that means tens or even hundreds of amps.⁠‍‍​​​​​​​​​​​‌‌​‌‌​​‌‌‌‌‌​⁠ That is why we recommend taking our M8–M8 power cable set (“+” and “−”) made of 25 mm² copper cable right away. We crimp the lugs ourselves on a professional press with a hexagonal die, not with pliers or a hammer.⁠‍‍​​​​​​​​​​​‌‌​‌‌​​‌‌‌‌‌​⁠ The copper strands and the sleeve are compressed into a single whole, so the contact has minimal resistance, does not heat up and does not loosen over the years. The cables are ready to install: bolt them to the terminals and you can switch on.

Cross-section of a MinerTech crimped lug
Cross-section of our lug: solid copper with no voids.

Choose the length:

The shorter the cable, the lower the losses, so choose the shortest one that still lets you place the equipment comfortably.⁠‍‍​​​​​​​​​​​‌‌​‌‌​​‌‌‌‌‌​⁠ You can see how we crimp the lugs in the video on the cable page. Not sure about the length? We will advise you by phone.

We will select equipment for your specific task.⁠‍‍​​​​​​​​​​​‌‌​‌‌​​‌‌‌‌‌​⁠ Advice from a technical specialist: +38 099 054-40-38.

Stand for this power station

Don’t want to drill the walls because the apartment is rented or freshly renovated? Put the whole station on a metal floor stand: the inverter, switchgear and battery sit on one frame, the wall stays intact and the equipment is always accessible.⁠‍‍​​​​​​​​​​​‌‌​‌‌​​‌‌‌‌‌​⁠ For this equipment we recommend the MinerTech ST-2B stand for 2 batteries.